Kladno Power Plant (2010-2014)

Unit 7 – 135 MW, Coal fired – CFB boiler

General designer of civil part of :

  • 1 x fluidized bed boiler with output 375 t/h of steam – supplier Foster Wheeler
  • 1 x 135MW steam turbine Škoda Doosan
  • Natural draft cooling tower
  • Coal handling system
  • Ash handling system
  • Limestone handling system
  • Chemical water treatment
  • Control system
  • Fire-fighting system
  • Stack

Tender Documentation, Demolition Documentation, Zoning Permit Documentation, Construction Permit Documentation, Detail Design of civil part.

Client: KAP – Kraftanlagen Power Plants GmbH

Kladno Power Plant (2010-2014)