Kladno Power Plant (2010-2014)
Unit 7 – 135 MW, Coal fired – CFB boiler
General designer of civil part of :
- 1 x fluidized bed boiler with output 375 t/h of steam – supplier Foster Wheeler
- 1 x 135MW steam turbine Škoda Doosan
- Natural draft cooling tower
- Coal handling system
- Ash handling system
- Limestone handling system
- Chemical water treatment
- Control system
- Fire-fighting system
- Stack
Tender Documentation, Demolition Documentation, Zoning Permit Documentation, Construction Permit Documentation, Detail Design of civil part.
Client: KAP – Kraftanlagen Power Plants GmbH