Kladno Power Plant (1996 - 2001)

Units 4, 5 and 6 – 2 x 135 MW + 1 x 70 MW

General designer of:

  • 2 x fluidized bed boiler with output 375 t/h of steam – supplier ABB Combustion
  • 2 x 135MW steam turbine ABB Stal VAX
  • Natural draft cooling tower
  • Two cells of forced draft cooling tower
  • Coal handling system
  • Ash handling system
  • Limestone handling system
  • Chemical water treatment
  • Control system ABB
  • Fire-fighting system
  • Stack
  • 1 x 70 MW gas TG (ABB GT8C) + heat recovery steam generator

Complete design and engineering services

Client: ABB

Kladno Power Plant (1996 - 2001)