Kladno Power Plant (1996 - 2001)
Units 4, 5 and 6 – 2 x 135 MW + 1 x 70 MW
General designer of:
- 2 x fluidized bed boiler with output 375 t/h of steam – supplier ABB Combustion
- 2 x 135MW steam turbine ABB Stal VAX
- Natural draft cooling tower
- Two cells of forced draft cooling tower
- Coal handling system
- Ash handling system
- Limestone handling system
- Chemical water treatment
- Control system ABB
- Fire-fighting system
- Stack
- 1 x 70 MW gas TG (ABB GT8C) + heat recovery steam generator
Complete design and engineering services
Client: ABB